Baltic Pipe – Odolanów Compressor Station

The Baltic Pipe investment involved expanding the existing gas compressor station in Odolanów, extending the transmission node and connecting these elements to the existing transmission infrastructure. Another investment within the project was the construction of a gas compressor station in Gustorzyn and the expansion of the installation forming part of the existing Gas Node.

Scope of supply:

  • Magnetic level gauges with guided wave radars
  • Displacer level meters
  • Pressure gauges with needle valves
  • Differential pressure gauges with manifolds
  • Bimetallic thermometers with thermowells

Baltic Pipe – Konarzewo Receiving Terminal – Płoty Gas Transmission Node

The Konarzewo Receiving Terminal is a pressure regulating and metering node with a capacity of 1,260,000 m³/h. The investment involved regulating and metering the volume of the gas stream transported from North Sea fields to Poland.
The Płoty Gas Transmission Node controls gas flows in the Szczecin – Gdańsk pipelines. The investment involved extending the node with a distribution system as well as metering and regulating systems for the gas supplied by pipeline from the Terminal towards Goleniów and Gdańsk.

Scope of supply:

  • Magnetic level gauges
  • Reed switch transmitters
  • Glass level gauges

Mobile Production Units (MOW)

This structure consists of a dozen or so skid-mounted modules housing a fully instrumented three-phase separator. Installed at the wells, the modules enable natural gas production and its transfer to the transmission and distribution networks. Once production ends, the mobile unit can be quickly dismantled and started up at a new location.

Scope of supply:

  • Magnetic level gauges
  • Pressure gauges with needle valves
  • Bimetallic thermometers

Husów Underground Gas Storage Facility

The Organic Rankine Cycle (ORC) is the first technology in Poland to convert waste heat into electricity (without CO2). It is an innovative technology used to convert thermal energy into electrical energy. Unlike the traditional Rankine cycle, ORC uses organic working fluids instead of water. The installation consists of a regenerator, a condenser, an evaporator and a high-speed turbine. It is divided into two circuits: the thermal oil circuit and the toluene circuit, toluene being the working fluid.

Scope of supply:

  • Magnetic level gauges
  • Pressure gauges with needle valves
  • Differential pressure gauges with manifolds
  • Bimetallic thermometers
  • Control valves with Rotork actuators
  • Pressure switches

Gas conditioning station for the turbines Czechnica CHP Plant

The project “Connection of the Czechnica CHP Plant to the transmission network” covered DN 500 and DN 300 connecting pipelines (MOP 8.4 MPa) as well as the construction of the Sulimów regulating station with a capacity of 200,000 m3/h and the Czechnica metering station with a capacity of 63,000 m3/h. The pipeline connected the New Czechnica CHP Plant, built by Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A., to the existing GAZ-SYSTEM gas infrastructure.

Scope of supply:

  • Magnetic level gauges
  • Reed switch transmitters
  • Pressure gauges with needle valves
  • Bimetallic thermometers

Pressure reduction and metering stations

As part of the PSG strategy to supply gas to new municipalities and towns, eliminating the so-called “white spots” on the map of the Polish gas industry, new gas stations were built and existing ones rebuilt. They included THT gas odorisation units and rooms with control and measuring equipment. They also housed ZZU shut-off and blow-down systems.

Scope of supply:

  • Magnetic level gauges
  • Pressure gauges with needle valves
  • Bimetallic thermometers

LNG regasification stations

Polska Spółka Gazownictwa worked to bring gas fuel to areas without a gas supply. The so-called “white spots” were supplied through island gasification based on LNG regasification technology. Each LNG regasification station was equipped with cryogenic tanks with a capacity of up to 100 m3, ambient air vaporisers to change the state from liquid to gas, a pressure reduction and metering station and an odorisation unit for odorising the gas with THT (tetrahydrothiophene).

Scope of supply:

  • Magnetic level gauges
  • Reed switch transmitters
  • Pressure gauges with needle valves
  • Bimetallic thermometers

Natural gas well development

Exploration for natural gas and crude oil deposits is carried out both in Poland and abroad. Well development requires building process infrastructure that enables production and the transfer of the produced reservoir fluid to the process plant for final treatment. These installations comprise gas heating, pressure reduction, solids separation and dosing of hydrate and corrosion inhibitors.

Scope of supply:

  • Magnetic level gauges
  • Glass level gauges
  • Displacer level meters
  • Guided wave radars
  • Vibrating level switches
  • Pressure gauges with needle valves
  • Differential pressure gauges with manifolds
  • Bimetallic and gas-actuated thermometers
  • Ball and control valves with Rotork actuators
  • Pressure switches

Construction of the DN1000 Gustorzyn – Wronów gas pipeline

The 308 km Gustorzyn – Wronów pipeline connects the Gustorzyn compressor station with the Wronów compressor station. The pipeline diameter is 1000 mm and the maximum operating pressure is 8.4 MPa. The natural gas filter separators were equipped with local and remote level measurement.

Scope of supply:

  • Vibrating level switches
  • Magnetic level gauges
  • Reed switch transmitters

Modernisation of process installations and tanks Zespół Elektrowni Pątnów-Adamów-Konin S.A.

The modernisation involved adapting an installation previously used to generate electricity from lignite to burn biomass. The boiler and other hot water tanks were retrofitted with level measurement systems.

Scope of supply:

  • Magnetic level gauges
  • Reed switch transmitters
  • Shut-off valves

ORC micro power plants up to 10 kWe and 30 kWe

The Organic Rankine Cycle (ORC) is the first technology in Poland to convert waste heat into electricity (without CO2). It is an innovative technology used to convert thermal energy into electrical energy. Unlike the traditional Rankine cycle, ORC uses organic working fluids instead of water. The installation consists of a regenerator, a condenser, an evaporator and a high-speed turbine. It is divided into two circuits: the thermal oil circuit and the toluene circuit, toluene being the working fluid.

Scope of supply:

  • Magnetic level gauges
  • Level transmitters
  • Flanged valves
  • Reflex glass level gauges

Construction of two combined-cycle gas turbine units – Dolna Odra Power Plant Complex

The investment involved building two combined-cycle gas turbine units with a total installed capacity of 1366 MW at the Dolna Odra Power Plant, owned by PGE Polska Grupa Energetyczna. The new gas units replaced old, inefficient coal-fired units, in line with the PGE Group’s strategy to decarbonise its generating assets.

Scope of supply:

  • Magnetic level gauges
  • Reed switch transmitters

Modernisation of boilers no. 3 and 4 for Qemetica Soda Polska S.A.

The overhaul included replacing two glass level gauges with shut-off valves and illumination on the existing 1500 mm diameter steam drum made by Rafako in 1998.

Scope of supply:

  • Illuminated magnetic level gauges

Overhaul of PWC high-pressure heaters of steam boilers

During the overhaul, 10 magnetic level gauges were replaced on steam boilers operating at temperatures up to +350°C.

Scope of supply:

  • Magnetic level gauges

Construction of a new generating unit at the Bydgoszcz CHP Plant

The investment involved building a gas unit at the Bydgoszcz II CHP Plant consisting of five gas-engine cogeneration sets with a total electrical output of 52.7 MWe and thermal output of 52.2 MWt, as well as a reserve and peak source with a total output of over 70 MWt.

Scope of supply:

  • Magnetic level gauges
  • Level switches

Expansion and modernisation of process installations “Goświnowice” Ethanol Plant

The investment covered a number of process stages related to the production of ethanol and feed materials. As a result, water vapour emissions from the feed drying plant were reduced by 50%. This reduced odour intensity as well as the water and energy consumption needed for production. Energy from the end of the process was returned to one of the initial production stages. The energy recovered as hot steam is used, among other things, to heat the mash.

Scope of supply:

  • Magnetic level gauges

Plant producing electrolyte for lithium-ion accumulators and batteries

A modern, technologically advanced factory was built in Śrem to produce electrolyte for lithium-ion (Li-Ion) accumulators and batteries, used mainly in electric cars. The Polish plant has a capacity of 40,000 tonnes of electrolyte per year.

Scope of supply:

  • Pressure gauges with needle valves
  • Thermometers with thermowells

Construction of a plant producing a secondary conductive agent for lithium-ion batteries

The investment involved building a plant that produces conductive CNT pastes for lithium-ion batteries, increasing their performance and service life. The 6 m high outdoor tank to be instrumented, used for storing the solvent (N-methyl-2-pyrrolidone), is part of the ANP Enertech production line.

Scope of supply:

  • Magnetic level gauges

NaOH caustic soda storage installation

The 18–21% NaOH caustic soda (sodium hydroxide solution) installation required the tanks to be fitted with local measurement. Due to the pressure and temperature, level gauges with a special hydroxide-resistant coating were supplied.

Scope of supply:

  • Magnetic level gauges with ECTFE-coated wetted parts

Hydrogen Recovery Unit (WOW)

The Hydrogen Recovery Unit (WOW) separates LPG, light and raw naphtha, and hydrogen. The heart of the installation is the so-called coldbox, in which the residual gas mixture is split into liquid hydrocarbons and gaseous hydrogen at –180°C and 45 bar. Under these conditions, hydrogen with a purity of 98.6% is obtained.

Scope of supply:

  • Magnetic level gauges
  • Pressure gauges with needle valves
  • Thermometers with thermowells

Overhaul of the Px48 steam locomotive boiler

The project involved developing, together with the Polish Narrow Gauge Railways Foundation, a special level gauge reflecting the era in which the locomotive operated. The glass gauge showing the water level in the boiler was designed so that the driver could easily replace the glass tube.

Scope of supply:

  • Glass level gauges with a special glass tube replacement system

Rocket and Satellite Propulsion Laboratory Centre. High-test hydrogen peroxide (HTP)

The Laboratory Centre was established by the Łukasiewicz Research Network. It made R&D projects and commercial cooperation even more efficient, including the development of green rocket and satellite propulsion. In this project, the customer required instrumentation of tanks containing high-test 98% hydrogen peroxide.

Scope of supply:

  • Guided wave radars with diaphragm seals

Thermal oil tanks

The project involved instrumenting tanks containing a mixture of methylcyclohexane and trimethylpentane. Therminol® VLT thermal oil has exceptionally low viscosity at low temperatures, which ensures good heat transfer even at -115 °C.

Scope of supply:

  • Cryogenic magnetic level gauges

10 m high hot water tanks

The project involved retrofitting hot water tanks with local level measurement and a transmitter for remote monitoring. A special design of the level gauges allowed them to be installed and commissioned in one piece without splitting the measurement.

Scope of supply:

  • Magnetic level gauges, 8.5 m long
  • Reed switch transmitters

Hydrophore units on ships

Specially designed hydrophore units for preparing, treating and pumping drinking water in fresh water systems on ships. The units are equipped with a hydrophore tank, a heater, a pump system and a power and control switchboard. The supplied level gauge had to meet LR (Lloyd’s Register) classification for a class 3 hydrophore tank.

Scope of supply:

  • Transparent level gauges with LR classification

Construction of a system for collecting and burning dilute non-condensable gases from a pulp mill

The investment included tanks and an installation capturing sodium hydroxide in the water filtration building.

Scope of supply:

  • Magnetic level gauges
  • Pressure gauges with needle valves
  • Thermometers with thermowells

Boiler house modernisation at Mondi BZWP

Mondi BZWP is a plant specialising in the production of corrugated board and cardboard packaging. During the boiler house overhaul at the Bystrzyca Kłodzka plant, the transparent glass level gauges were replaced.

Scope of supply:

  • Transparent level gauges

Modernisation of oil systems at the “Cedynia” Copper Rolling Mill

The modernisation involved removing old devices and installing new level measurement and level switching devices in tanks storing TRANSOL® gear oil.

Scope of supply:

  • Magnetic level gauges with level switches
  • Pressure gauges with siphons
  • Needle valves

Choose your language

We want your experience on our website to be as comfortable as possible. Therefore, you can easily change the language by clicking on the appropriate flag at the top of the page. Thanks to this, we will adapt the content especially for you. Enjoy browsing!

[gtranslate]